UK telecoms news / Satellite spectrum
Ofcom Proposes Two-Stage Reform of Satellite Spectrum-Sharing Rules
The UK regulator wants international satellite interference rules modernised so newer constellations can use radio spectrum more efficiently without losing the protections relied on by existing networks.
The short answer: In a paper published on 12 October 2026, Ofcom called for changes to the international rules that control interference between traditional geostationary satellites and newer non-geostationary systems. It wants targeted improvements by WRC-27 and a wider review for WRC-31. These are proposals for international discussion, not new rules already in force.
The paper is titled Reforming the ITU’s EPFD framework: GSO and NGSO sharing in Ku and Ka bands. Behind the technical name is a practical question: how much radio interference should fast-growing satellite constellations be allowed to generate when they operate near long-established satellite networks?
What exactly is Ofcom proposing?
Ofcom wants to update the equivalent power flux density (EPFD) framework, a set of internationally agreed interference limits contained in the International Telecommunication Union’s Radio Regulations. These rules have been in place for more than 25 years. They help different satellite systems use parts of the same radio spectrum without one causing unacceptable disruption to another.
The immediate focus is on the downlink: signals travelling from non-geostationary satellites towards Earth, and the unwanted power those signals can direct towards receivers used by geostationary systems.
How the two satellite systems share spectrum
Two orbital arrangements, one shared interference rulebook
Conceptual diagram; not to scale. The proposed work concerns sharing rules in the Ku and Ka satellite bands, particularly downlink interference affecting GSO terminals. It is not a diagram of domestic Wi-Fi signals.
Ofcom’s aim is to allow more efficient sharing as satellite equipment, antennas and traffic patterns change. At the same time, it says existing GSO operators still require proportionate protection. Their services can include broadcasting, business connectivity and public-sector links.
Three changes Ofcom wants examined before 2027
The regulator has identified targeted improvements for study ahead of the next World Radiocommunication Conference, known as WRC-27. They are not blanket permission for satellite operators to increase their transmission power.
Align the Ka-band protection limits
Ofcom questions why the lower downlink Ka band (17.8–18.6 GHz) and upper band (19.7–20.2 GHz) use different short- and long-term limits. It suggests examining an alignment based on the least restrictive limits already applied in those bands.
Use more realistic interference calculations
Ofcom wants the ITU-R S.1503 compliance method to reflect modern satellite tracking, antenna patterns, traffic distribution, geometry and propagation modelling rather than assumptions that may be unnecessarily conservative.
Better account for multiple constellations
Instead of relying entirely on older modelling assumptions, Ofcom supports work on assessing combined interference from different NGSO systems and on acting where harmful effects could result.
These are areas for international technical work. Any adopted changes would still need agreement through the relevant ITU processes and workable ways to verify compliance.
The timetable: targeted changes in 2027, deeper review in 2031
Ofcom favours two phases because a wholesale replacement of the EPFD framework would take time to study and negotiate. It says the first phase could improve spectrum sharing without materially weakening GSO protections; the second would consider whether the underlying framework needs more substantial reform.
A proposed route to reform
The dates are international conference milestones, not guaranteed implementation dates. Ofcom also says the possible introduction of any major changes may need to be gradual.
Its longer-term principles include rules that are measurable and enforceable, predictable enough to support investment, adaptable as technology improves and consistent across countries. Ofcom argues that a common international system is preferable to an assortment of national exceptions, which could make global satellite operations more complicated.
What could this mean for UK satellite broadband?
The immediate effect for households is limited: Ofcom has not announced a new Starlink speed, a cheaper package or a change to customer contracts. Its paper addresses the technical rules behind satellite network design, not retail prices.
Over time, better sharing could potentially help operators use satellite capacity more efficiently and support competition. Ofcom points to the growing importance of NGSO systems for broadband in underserved areas, aeroplanes, ships and other connectivity applications. Its earlier analysis of Starlink and the UK rural broadband gap explains why satellite options already matter to remote homes.
The market is also evolving beyond a single constellation. Our Starlink versus Amazon Leo comparison looks at two different approaches to low-Earth-orbit internet services, although any future EPFD changes would apply through technical rules rather than through brand-specific benefits.
For rural households deciding whether to wait for a fibre build or install a satellite dish, the nearer-term question remains whether an available service suits the property, budget and performance needs. We examine that wider choice in our guide to satellite broadband and rural fibre.
What happens next?
Ofcom says it has begun measurement and modelling work to assess the sensitivity of GSO systems to interference and identify which assumptions place the greatest constraints on NGSO networks. It expects to contribute evidence to international discussions, including ITU Working Party 4A and European forums.
The regulator is inviting views and supporting evidence as its position develops. Its main paper provides the contact address EPFD@ofcom.org.uk for stakeholders who want to discuss the proposed route.
The central issue is a trade-off, not a simple choice between old and new satellites. Operators need room to innovate, while essential communications networks need clear and enforceable protection. Ofcom’s role as a UK communications regulator includes managing spectrum, but in this case the regulator is seeking progress through international rulemaking rather than acting alone.
The bottom line
Ofcom wants satellite spectrum sharing to reflect modern constellations without removing protection for established networks. Its 12 October 2026 paper proposes targeted international updates around WRC-27 and a bigger rethink at WRC-31. No new customer-facing rules have been enacted by this announcement.
FAQs about Ofcom’s satellite spectrum proposals
What did Ofcom publish on 12 October 2026?
Ofcom published a position paper on reforming the ITU’s equivalent power flux density (EPFD) framework for sharing Ku and Ka radio spectrum between geostationary and non-geostationary satellite networks. It proposes targeted work by WRC-27 and a wider review at WRC-31.
Has Ofcom already changed the EPFD interference limits?
No. The paper sets out Ofcom’s preferred direction for international discussions. It is not an announcement that revised EPFD limits have come into force.
Which frequencies are specifically mentioned for near-term changes?
Ofcom highlights differences between the lower Ka downlink band at 17.8–18.6 GHz and the upper Ka downlink band at 19.7–20.2 GHz. It suggests studying whether their interference-protection limits can be better aligned.
Why does Ofcom want the S.1503 calculation reviewed?
Ofcom says the ITU’s interference-compliance method should better reflect current satellite tracking, antenna performance, traffic patterns and propagation assumptions, so that restrictions are proportionate to real operating conditions.
When could international satellite-sharing rules change?
Ofcom is aiming for targeted improvements at or by the 2027 World Radiocommunication Conference and a more fundamental review at the 2031 conference. Adoption and implementation depend on international agreement; neither date guarantees a rule change.
Sources
- Ofcom: Reforming the ITU’s EPFD framework, published 12 October 2026
- Ofcom’s six-page technical position paper (PDF), including proposals for WRC-27 and WRC-31
- Ofcom: NGSO licensing review statement, March 2026, background on the separate UK licensing regime
